No. | Title | Employer | Year |
---|---|---|---|
1 | Complete energy audit for 8 transmission substations and 10 distribution substations in Hormozgan province | Hormozgan Electricity Distribution Company | 2011 |
2 | Reducing power loss in the city of Parsian | Hormozgan Electricity Distribution Company | 2011 |
3 | Power quality measurement and evaluation of 33 nodes | Azerbaijan Regional Electric Company | 2011 |
4 | Providing technical services for small-scale generators | Esfahan Electricity Distribution Company | 2011 |
5 | Performing technical studies and preparation of detailed plans for installation of a 4.3MW power plant and its connection to the grid | Chodan Zob Jam | 2011 |
6 | Engineering and technical consulting services for small-scale generation and combined heat and power production | Arvin Sanat Rateb | 2011 |
7 | Engineering and technical consulting services for small-scale generation and combined heat and power production | Sarmad Shabnam Sepahan | 2011 |
8 | Plant interior design, implementation and monitoring of network connection | Chodan Zob Jam | 2011 |
9 | Network modeling and technical studies of connecting biogas plant to the grid | Esfahan Electricity Distribution Company | 2011 |
10 | Network modeling, providing protection scheme and protection coordination of Bahar Ris Power Plant | Esfahan Electricity Distribution Company | 2011 |
11 | Network modeling and technical studies of connecting Divdel plant to the grid | Esfahan Electricity Distribution Company | 2011 |
12 | Engineering studies and analyzing the electrical system of 650 rolling workshop feeder | Esfahan Steel Co. | 2011 |
13 | Power quality analysis of Ilam, Kordestan and Kermanshah Electrical Networks | Gharb Regional Electric Company | 2011 |
14 | Furnishing and installation of 30 UPS systems and accessories | Mashhad Transportation and Traffic Organization | 2011 |
15 | Project Supervision of power quality measurement in 100 nodes | Khuzestan Regional Electric Company | 2011 |
16 | Electrical network consultant | Omid Safety Glass | 2011 |
17 | DG consultant for Sobhan-Rojhan Power Plant | Mr. Hajati | 2011 |
18 | DG consultant | Mr. Yazdani | 2011 |
19 | Power quality analysis of electrical network | Fars Regional Electric Company | 2011 |
20 | Power quality analysis for 100 nodes in Sistan and Balouchestan Province | Sistan and Balouchestan Province Electric Power Company | 2011 |
21 | Consulting services to optimize the placement of distribution generators | Hormozgan Electricity Distribution Company | 2011 |
22 | Construction of 26 electrical panels | ZayandehRood Housing Investment | 2011 |
23 | Construction of 3 substation electrical panels and 3 electrical cubicle panels | ZayandehRood Housing Investment | 2011 |
24 | Construction of eight electrical panels | ZayandehRood Housing Investment | 2011 |