Comprehensive Plan

Comprehensive Plan

In order to assess the current situation of the network, find its weaknesses and plan to develop the network in coming years a comprehensive plan is needed.

As required by Iran Power Generation and Transmission Company (TAVANIR), the steps needed to conduct a comprehensive study of a network are:

 

 

  1. Gathering and preparing information, such as clients' billings, GIS, master plan maps, feeder and substation information, blackout information, switching information, distribution substation loading, etc.
  2. Load estimation: estimation of current load density and that of the following years.
  3. Performing load flow studies, reliability studies and short circuit studies.
  4. Designing the electrical network for the target year considering the limitations imposed by the employer.
  5. Designing the interim electrical network, defining the gradual steps to reach the target network.
  6. Presenting reports.


BCE is ready to perform such studies with efficiency, accuracy and speed. We've developed softwares that can optimize the location of distribution and sub-transmission substations, power switches and protection gears. You can check out the list of these softwares here.